How Does The Busbar Insulator Product?

Publish Time: Author: Site Editor Visit: 726

Some Clients always doubt on delivery time on OEM insulator.

1.CAD drawing according client's technical data or sample.

2.confirm CAD drawing with client

3.make mold according CAD ,about 30days.

4.mold finished, and test,confirm sample with clients

5.install mold into machine,about 2.5hours

6.heating machine ,about 2.5hours

7.production as following:weight,heating,forming,clearning,packing.

 

Of course,there is stock for standard insulator,such as SM,MNS,SEP.EL....

Delivery at sight.

If you need, please contact with us.

 